SERVICES / 03
Environmental engineering
Consider environmental constraints early in your project.

A clear engineering scope.
Understand how the site and its surrounding environment can influence the engineering approach and the information needed for a development.
Each project begins with its own requirements. The work, deliverables and inspection limits should be agreed before the assessment or design starts.
Site context
Identify the environmental questions relevant to the proposed work.
Planning coordination
Clarify which reports or specialist inputs may be needed for the project.
Integrated design
Consider environmental issues alongside structural and water engineering requirements.
SERVICE SCOPE
What the work can cover.
The following areas can form part of a project brief. The services, deliverables and suitability for your site are confirmed when the scope is agreed.
Site constraints review
Consideration of the environmental context and constraints relevant to the proposed development.
Environmental planning inputs
Identification of engineering information needed to respond to project-specific planning and environmental questions.
Erosion & sediment management
Consideration of measures to limit soil erosion and sediment movement during site works, within the agreed engineering scope.
Runoff & receiving environments
Review of how site runoff and drainage proposals relate to the surrounding environment.
Construction environmental considerations
Coordination of environmental engineering questions that arise from the proposed construction activities.
Coordination with specialist reports
Review of available environmental information and identification of where separate specialist input may be needed.
PROJECT INFORMATION
What to have ready.
Your site and proposal
Provide the property address, a description of the existing building or site, and the work you are considering. Explain whether the enquiry relates to a new design, an existing concern or work already underway.
Available documents
Gather architectural plans, surveys, previous engineering drawings, geotechnical reports, planning advice and relevant photographs. Existing information helps identify gaps before the engineering work starts.
Your priorities
Outline the main questions you want answered, your current project stage and any dates the team needs to coordinate around.
Access and scope
Confirm site access and whether particular structural elements or drainage features are concealed. Inspection, testing, design and construction support may involve different scopes.
DELIVERABLES
Clear information for the next stage.
Depending on the commission, outputs may include engineering drawings, an assessment report, inspection findings or recommendations for further investigation. The quotation should identify the exact documents, review stages and any exclusions, so you know what the engineering work will provide.
PROJECT EXAMPLES
See how this service can apply.
The examples below are placeholders for future SK case studies. They do not represent completed projects.
EXAMPLE PLACEHOLDERSite development review
Environmental engineering considerations for a proposed development
- Location
- Replace with the actual project location
- Engineering scope
- Site constraints, available reports and specialist coordination
- Outcome
- Add the actual outcome and approved project photographs
EXAMPLE PLACEHOLDERSediment management
Erosion and sediment considerations during site works
- Location
- Replace with the actual project location
- Engineering scope
- Site levels, drainage paths and proposed construction activities
- Outcome
- Add the actual outcome and approved project photographs
SERVICE QUESTIONS
Useful things to know.
When should environmental constraints be considered?
At the beginning of the project, before the design becomes difficult to change.
What information should I bring?
Provide the property address, proposed use, plans and any existing planning advice or environmental reports.
Does every project need the same assessment?
No. Requirements depend on the site, the proposal and the scope requested by the relevant authority.